CONSTRUCT PERIMETER ROAD

Place and Date : Incirlik Air Base Adana / TURKEY, 2011

Client : USAF, 39. CONS LGC FA5685 (FOREIGN)

Description : After the present stabilized pavement was removed, a new concrete pavement, which is 15 cm thick, was constructed. Under the concrete layer, a new stabilized base course layer, made of crushed aggregate and 15 cm thick, was laid down.ln addition, on the roadsides of the pavement, 1.5 meter wide shoulders were built.