CONSTRUCT ROOF HANGAR, INCIRLIK AB, ADANA / TURKEY
CONSTRUCT ROOF HANGAR Place and Date : Incirlik Air Base, Adana / Turkey, 2012 Client : 39 CONS / LGCFA5685 (FOREIGN) Description : Provide and install new roof system for Hangar
CONSTRUCT ROOF HANGAR Place and Date : Incirlik Air Base, Adana / Turkey, 2012 Client : 39 CONS / LGCFA5685 (FOREIGN) Description : Provide and install new roof system for Hangar
SANITARY SEWER SYSTEM, PHANTOM MFH-EAST Place and Date : Incirlik Air Base, Adana / Turkey, 2012 Client : 39 CONS / LGCFA5685 (FOREIGN) Description : Repair existing Sanitary Sewer System, provide new sewer main line , lateral line, new sewer manholes and new metal lockable covers.
ASPHALT ROAD CONSTRUCTION Place and Date: Incirlik Air Base Adana TURKEY, 2012 Client : USAF, 39. CONS LGC FA5685 (FOREIGN) Description : Stabilized base course, groundwork and asphalt pavement were constructed. On the roadsides, the drainage system, the shoulder construction and road markings were completed.
CONSTRUCT ROOF SIDING HANGAR Place and Date : Incirlik Air Base, Adana / Turkey, 2011 Client : 39 CONS / LGCFA5685 (FOREIGN) Description : Completed the roof and siding of aircraft maintenance Hangar
CONSTRUCT PERIMETER ROAD Place and Date : Incirlik Air Base Adana / TURKEY, 2011 Client : USAF, 39. CONS LGC FA5685 (FOREIGN) Description : After the present stabilized pavement was removed, a new concrete pavement, which is 15 cm thick, was constructed. Under the concrete layer, a new stabilized base course layer, made of crushed aggregate […]
RUNWAY SHOULDERS ASPHALT PAVEMENT Place and Date : Incirlik Air Base Adana / TURKEY, 2011 Client : USAF, 39. CONS LGC FA5685 (FOREIGN) Description : After the present shoulder asphalt pavement and stabilized material were cut and removed in accordance with the orginal project, the new main layer of crushed aggregate and mechanically stabilized layer […]
RUNWAY REPAINT STRIPING Place and Date : Incirlik Air Base Adana / Turkey, 2010 Client : 39 CONS / LGC FA5685 (FOREIGN) Descrlptlon : Repainting centerline of the runway, moon markers and lead-in markings and application of glass beads by machine.
KANDILLI DARIA PARK HOUSES Place and Date: Kandilli / Uskudar / Istanbul / Turkey, 2008 – 2010 Floor Area : 5.000 sqm Description : Located in the most prestigious area of Uskudar Kandilli, the compound consists of 3 blocks offering 3 different types of flats. The compound is designed tora life beyond the best with […]
DERINCE EDUCATION AND RESEARCH HOSPITAL Place and Date : Derince / Kocaeli / Turkey, 2006-2007 Client : Governership Of Kocaeli / Turkey Floor Area : 52.300 sqm Description : Derince Education and Research Hospital is a full scope healt facility servicing 385 in-house patients. The hospital is an educational institution which gives specialist medical education.The hospital […]
PEST MANAGEMENT FACILITY Place and Date : Incirlik Air Base Adana / Turkey, 2005-2006 Client : 39 CONS / LGCFA5685 (FOREIGN) Description : Construction of a reinforced single story building to be used as Pest Management Facility, complete with roads, pavements and fencing, provision and installation of heating, ventilating, air conditioning and plumbing systems, indoor […]